LNG Modules

This project included the construction of three large-scale modular, prefabricated industrial buildings accommodating critical LNG infrastructure and an additional ASD building.
The buildings feature a sophisticated fire and gas alarm system and reliable power distribution system comprised of normal, emergency and UPS power.
As JL Marine Engineering team was unfamiliar with Canadian engineering standards and practices, WE completed the reviews of 60% and 100% mechanical and electrical drawings for the full buildings, along with a review of the specifications, equipment lists and control sequences.
The structural design incorporated many loading scenarios, including environmental loading in the construction yard, sea transportation, land transportation and final in-situ design loading, including seismic considerations and high snow loading.
Crane impact and thermal loading were also considered in the design. In addition, WE also provided structural engineering services to obtain the necessary CSA-A660 certification.

^